Regional Municipality of Waterloo - Road and Lane Closure Notification
Effective: Tuesday, July 7, 2015 - 4:00 p.m.

Transportation Division
150 Frederick Street, Kitchener  N2G 4J3
Telephone: 519-575-4558, Fax: 519-575-4453, Email: transportation@regionofwaterloo.ca

New (in alphabetical order by road name) 

Date/Duration  RoadMunicipalityDetourReasonContact

Wed., July 8
between 7 a.m.
and 7 p.m. 

Church Street

(Reg. Rd. 86)
between Arthur Street
and Weigel Avenue

Woolwich 

Lane Closures

Two-way traffic will be maintained.

Pedestrian traffic will be maintained
around the work zone. 

Road Paving

 

Jim Ellerman
Project Manager 
519-575-4757
ext. 3757

 

Wed., July 8
between 7 a.m.
and 7 p.m.

Snyder's Road

(Reg. Rd. 1)
between Nafziger Road
and Baden Water Tower
Entrance 

Wilmot

Lane Closures

Two-way traffic will be maintained.

Pedestrian traffic will be maintained
around the work zone. 

Road Paving 

Jim Ellerman
Project Manager 
519-575-4757
ext. 3757 

Thurs., July 9 to
Fri., July 17
between 9 a.m.
and 3 p.m. 

University Avenue

(Reg. Rd. 57)
between Seagram Drive
and Phillip Street 

Waterloo 

Lane Closures

Two-way traffic will be maintained.

Pedestrian traffic will be maintained
around the work zone.

Utility Installation 

 

Kelly Eitel
519-575-4757
ext. 3754 

 

Thurs., July 9
between 9 a.m.
and 3 p.m. 

University Avenue

(Reg. Rd. 57)
at Weber Street 

Waterloo 

Lane Closures

Two-way traffic will be maintained.

Pedestrian traffic will be maintained
around the work zone. 

Utility Maintenance 

Kelly Eitel
519-575-4757
ext. 3754 

Wed., July 8
between 7 a.m.
and 7 p.m.

Weber Street

(Reg. Rd. 8)
between Northfield Drive
and Benjamin Road 

Waterloo 

Lane Closures

Two-way traffic will be maintained.

Pedestrian traffic will be maintained
around the work zone. 

Road Paving 

Jim Ellerman
Project Manager 
519-575-4757
ext. 3757 

 Click here to return to top of page.

Existing (in alphabetical order by road name) 

Date/DurationRoadMunicipalityDetourReasonContact

Tues., July 7 to Mon., Aug. 10 between
9 a.m. and 3 p.m.

Bishop Street

(Reg. Rd. 41)
between Hespeler Road and Conestoga Boulevard

Cambridge

Lane Closures

Two-way traffic will be maintained.

Expect Delays

Pedestrian traffic will be maintained around the work zone.

Road
Reconstruction

Peter Linn
Project Manager
519-575-4757
ext. 3773

Tues., May 19 at
9 a.m.
for approx. 7 weeks
(Tues., July 7)

Bloomingdale Road

(Reg. Rd. 20)
between Bridge Street and Kraft Drive

 

Kitchener

Full Eastbound Closure

Detour via: Bridge Street / Ebycrest Road / Sawmill Road / Bloomingdale Road

Westbound traffic will be maintained.

Pedestrian traffic will be maintained around the work zone.

Surface Asphalt and Sidewalk Repair

Valerie MacQueen-Pearcey
519-575-4552 

Mon., Mar. 30 to
Thurs., Dec. 31

 

Borden Avenue

(Reg. Rd. 66)
between Courtland Avenue and Huron Spur

Kitchener

Full Closure

Local access will be maintained to all businesses and residences fronting on Borden Avenue.

Utilities Relocation

ION Telephone Line
1-844-625-1010

Email connect@rideion.ca

Mon., May 25 to
Mon., July 13
between 7 a.m.
and 5 p.m.

Bridgeport Road

(Reg. Rd. 9)
between Lang Crescent and Goldbeck Lane

Waterloo

Lane Closures

Two-way traffic will be maintained.

Pedestrian traffic will be maintained around the work zone.

Shoulder Grading

Click here for further
information on  the
MTO website

Tues., Oct. 14 (2014)
to Tues., Sept. 1

Caroline Street

(Reg. Rd. 9)
between Erb Street
and Allen Street

Waterloo

Full Closure

Detour via: King Street / Bridgeport Road / Caroline Street / Erb Street 

Utilities Relocation

 

ION Telephone Line
1-844-625-1010

Email connect@rideion.ca 

Mon., June 1
at 7 a.m. to
Fri., July 17  
at 5 p.m.

Caroline Street

(Reg. Rd. 9) 
at William Street

Waterloo

Full Closure

Pedestrian traffic will be maintained around the work zone. 

Utilities Relocation

ION Telephone Line 
1-844-625-1010

Email connect@rideion.ca 

Mon., Mar. 23 to
Fri., July 30

Charles Street

(Reg. Rd. 64)
between Benton Street
and Ottawa Street
Kitchener

Full Closure

Detour via: Benton Street / Weber Street / 
Ottawa Street

ION Construction

ION Telephone Line
1-844-625-1010

Email
connect@rideion.ca

Thurs., Apr. 9 to
Fri. July 31 

Charles Street

(Reg. Rd. 64)
between Victoria Street and Benton Street

Kitchener

Full Closure

Detour via: Ottawa Street / Weber Street / Victoria Street

Local access will be maintained to all businesses and residences fronting on  Charles Street.

Utilities Relocation 

ION Telephone Line
1-844-625-1010

Email connect@rideion.ca

Mon., June 15 at 7 a.m. until Fri., July 24

Charles Street

(Reg. Rd. 64)
at Borden

Kitchener

Full Closure

Pedestrian traffic will be maintained around the work zone.

Utilities Relocation

ION Telephone Line
1-844-625-1010

Email connect@rideion.ca

 

Mon., July 6 to
Fri., July 10

Church Street

(Reg. Rd. 86)
between Herbert Street and Barnswallow Drive

Woolwich

Full Eastbound Closure

Detour via: Church Street / Floradale Road / Listowel Road / Arthur Street

Westbound traffic will be maintained.

Pedestrian traffic will be maintained around the work zone.

 Surface Asphalt

Don Pletch
Project Manager
519-575-4757
ext. 3182

Mon., July 6 at 7 a.m. to Mon., July 17
at 5 p.m.

Courtland Avenue

(Reg. Rd. 53)
at Borden Avenue

 Kitchener

Full Closure

Detour via:  Stirling Avenue / King Street / Ottawa Street

Pedestrian traffic will be maintained around the work zone.

Utilities Relocation 

ION Telephone Line
1-844-625-1010

Email connect@rideion.ca

Until Further Notice

Covered Bridge Drive

West Montrose
Covered Bridge

Woolwich

Load Restriction on Bridge for
heavy trucks (over 3,000 kg).

Light vehicles permitted.

Preservation
of Historical Structure

Shawn Buckley
519-575-4093

Mon., Apr. 27 to
Wed., July 15
between 9 a.m.
and 3 p.m.

Eagle Street

(Reg. Rd. 39)
between Industrial Road and Hespeler Road

Cambridge

Lane Closures

Two-way traffic will be maintained.

Pedestrian traffic will be maintained around the work zone.

Bus Stop Installation

Samer Inchasi
Project Manager
519-575-4757
ext. 3462

Thurs., May 28 to
Wed., July 8
between 9 a.m.
and 3 p.m.

Erb Street

(Reg. Rd. 9)
at Ira Needles Boulevard

Waterloo

Lane Closures

Two-way traffic will be maintained.

Pedestrian traffic will be maintained around the work zone.

Utility Installation

 

Kelly Eitel
519-575-4757
ext. 3754 

Mon., July 6 to
Thurs., July 9
between 9 a.m.
and 3 p.m.

Erb Street

(Reg. Rd. 9)
at Allen Street

Waterloo

Lane Closures

Two-way traffic will be maintained.

Pedestrian traffic will be maintained around the work zone.

Utility Installation

 

Kelly Eitel
519-575-4757
ext. 3754  

Tues., July 7 to Thurs., July 9 between 7 a.m. and 5 p.m

Fairway Road

(Reg. Rd. 53)
between Wilson Avenue and King Street

Kitchener

 

Lane Closures

Two-way traffic will be maintained.

Pedestrian traffic will be maintained around the work zone

Water Service Connection

Josh Graham
519-575-4757
ext. 3312

Mon., July 6 to Fri., July 10 between 7 a.m. and 5 p.m.

Fischer-Hallman Road

(Reg. Rd. 58)
between Victoria Street and Glasgow Street

Kitchener

Lane Closures

Two-way traffic will be maintained.

Pedestrian traffic will be maintained around the work zone.

Bridge Repairs

Josh Graham
519-575-4757
ext. 3312

Wed., Apr. 22 to
Thurs., Oct. 22

Fountain Street

(Reg. Rd. 28)
overpass across Highway 401

Cambridge

Full Closure

Detour via: Eastbound - Eagle Street to Speedsville Road (cars) or Hespeler Road (trucks) to Maple Grove Road.

Detour via: Westbound - Shantz Hill Road to King Street to Sportsworld Drive to Maple Grove Road.

(Ministry of Transportation - Ontario)

MTO Bridge Rehabilitation

Click here for further information on  the MTO website

 

Thurs., July 2 to
Wed., July 8
between 9 a.m.
and 3 p.m. 

Fountain Street

(Reg. Rd. 28)
between Shantz Hill Road
and King Street 

Cambridge 

Lane Closure

Two-way traffic will be maintained.

Pedestrian traffic will be maintained around the work zone

Borehole Drilling  Jason Lane
Project Manager
519-575-4608 

Mon., June 8 until
approx. mid November

Franklin Boulevard

(Reg. Rd. 36)
between Clyde Road and Green Gate Boulevard

Cambridge

Lane Closure

Expect Delays

Two-way traffic will be maintained.

Pedestrian traffic will be maintained around the work zone.

Road Reconstruction

Frank Kosa
Project Manager
519-575-4757
ext. 3185

Tues., June 16 to
Fri., Sept. 4
between
7 a.m. and 7 p.m.

Frederick Street

(Reg. Rd. 6)
between Edna Street and Ann Street

Kitchener

Lane Closures

Two-way traffic will be maintained.

Pedestrian traffic will be maintained around the work zone.

Bridge Rehabilitation

Steve Sieunarine
519-575-4030

Tues., July 7
between 7 a.m.
and 7 p.m.

Hawkesville Road

(Reg. Rd. 17)
between C.P.N . Tracks and Three Bridges Road

Woolwich

Lane Closures

Two-way traffic will be maintained.

Pedestrian traffic will be maintained around the work zone

Road Paving

 

Jim Ellerman
Project Manager 
519-575-4757
ext. 3757

Mon., Apr. 13 to
Wed., July 15
between 9 a.m.
and 3 p.m. 

Hespeler Road

(Reg. Rd. 24)
at Coronation Boulevard/ Dundas Street 

Cambridge

Lane Closures 

Two-way traffic will be maintained.

Pedestrian traffic will be maintained around the work zone. 

Bus Stop Installation 

Samer Inchasi
Project Manager
519-575-4757
ext. 3462 

Mon., Apr. 13 to
Wed., July 15
between 9 a.m.
and 3 p.m. 

Hespeler Road

(Reg. Rd. 24)
at Can-Amera Parkway

Cambridge

Lane Closures 

Two-way traffic will be maintained.

Pedestrian traffic will be maintained around the work zone. 

Bus Stop Installation 

Samer Inchasi
Project Manager 
519-575-4757
ext. 3462 

Mon., May 4 to
Wed., July 15
between 9 a.m.
and 3 p.m.

Hespeler Road

(Reg. Rd. 24)
at Munch Avenue/ Isherwood Avenue

Cambridge

 Lane Closures

Two-way traffic will be maintained.

Pedestrian traffic will be maintained around the work zone.

Bus Stop Installation

Samer Inchasi
Project Manager
519-575-4757
ext. 3462

Mon., June 8 to
Fri., Oct. 30
between 9 a.m.
and 3 p.m.

 

Hespeler Road

(Reg. Rd. 24)
between Queen Street and Pinebush Road

Cambridge

Lane Closure

Two-way traffic will be maintained.

Pedestrian traffic will be maintained around the work zone.

Bridge Rehabilitation

Fred Vock
MTO
519-505-3695

Mon., July 6 to Fri., July 10 between
9 a.m. and 3 p.m.

Hespeler Road

(Reg. Rd. 24)
between Munch Avenue and Eagle Street/Pinebush Road

Cambridge

Lane Closure

Two-way traffic will be maintained.

Pedestrian traffic will be maintained around the work zone.

Flower Bed Maintenance

Bert Klein-Horsman
City of Cambridge
519-653-5470

Lindsay Hemmerling
519-575-4757
ext. 3751

Mon., Apr. 13 to
Fri., Oct. 30
starting at 7 a.m. 

Highland Road

(Reg. Rd. 6)
between Patricia
Avenue and
Westmount Road

Kitchener

Lane Closures

Two-way traffic will be maintained.

Pedestrian traffic will be maintained around the work zone.  

Reconstruction

Mike Halloran
Project Manager
519-575-4529

Mon., Mar. 23 to
Thurs., July 30

King Street

(Reg. Rd. 15)
between Union Street
and Victoria Street
 Kitchener

Full Closure

Detour: Union Street / Weber Street / Victoria Street

ION Construction

ION Telephone Line
1-844-625-1010

Email
connect@rideion.ca

Mon., Apr. 20 to 
Thurs., Aug. 20
between 7 a.m.
and 7 p.m.

King Street

(Reg. Rd. 15)
between Conestogo Road and Weber Street
Waterloo

Lane Closures

Two-way traffic will be maintained.

Pedestrian traffic will be maintained around the work zone.

Road Reconstruction 

Kelly Eitel
519-575-4757
ext. 3754  

 

Mon., May 25 to
Mon., July 13
between 7 a.m.
and 5 p.m.

King Street

(Reg. Rd. 15)
between Conestogo Road and Blue Springs Drive

Waterloo

Lane Closures

Two-way traffic will be maintained.

Pedestrian traffic will be maintained around the work zone.

Shoulder Grading 

Click here for further information on  the
MTO website

 

Mon., May 25 to
Mon., July 13
between 7 a.m.
and 5 p.m.

King Street

(Reg. Rd. 15)
between Farmer's Market Road and Market Grove Road

 Woolwich

Lane Closures

Two-way traffic will be maintained.

Pedestrian traffic will be maintained around the work zone.

Shoulder Grading

Click here for further information on  the
MTO website

 

Mon., June 8 at
7 a.m. approx. 18 months
(Dec. 2016)

King Street

(Reg. Rd. 15)
between Victoria Street and Breithaupt

Kitchener

Full Closure

Pedestrian traffic will be maintained around the work zone.

Utilities Relocation 

ION Telephone Line
1-844-625-1010

Email connect@rideion.ca

 

Mon., June 29 to
Fri., Nov. 20
between 7 a.m.
and 5 p.m.

King Street

(Reg. Rd. 8)
between Hofstetter Avenue and Freeport Hospital

Kitchener

 

Lane Closures

Two-way traffic will be maintained.

Pedestrian traffic will be maintained around the work zone.

Infrastructure Installation

Josh Graham
519-575-4757
ext. 3312

Thurs., July 2 to
Wed., July 8
between 9 a.m.
and 3 p.m. 

King Street

(Reg. Rd. 8)
between Fountain Street
and Dover Street

Cambridge

Lane Closures

Two-way traffic will be maintained.

Pedestrian traffic will be maintained around the work zone.

Borehole DrillingJason Lane 
Project Manager 
519-575-4608

Thurs., July 2 or Fri., July 3 
from 7 p.m. 
to 7 a.m. for
approx. 2 weeks

King Street

(Reg. Rd. 15) 
between Waterloo
St. Jacobs Railway and Lobsinger Line

Woolwich

Lane Closure

Two-way traffic will be maintained.

Pedestrian traffic will be maintained around the work zone.

Surface AsphaltDon Pletch 
Project Manager 
519-575-4757 
ext. 3182 

Mon., July 6 to Fri., July 10 between
9 a.m. and 3 p.m.

King Street

(Reg. Rd. 8)
between Eagle Street and Bishop Street

Cambridge

Lane Closures

Two-way traffic will be maintained.

Pedestrian traffic will be maintained around the work zone.

Borehole Drilling Investigation

Dave Brown
Project Manager
519-575-4757
ext. 3686

Tues., July 7
between 7 p.m.
and 7 a.m.

King Street

(Reg. Rd. 15)
between Lobsinger Line and Weber Street

Woolwich

Two-way traffic will be maintained via flagging operations.

Pedestrian traffic will be maintained around the work zone.

Surface Asphalt

Don Pletch
Project Manager
519-575-4757
ext. 3182 

Mon., May 25 to
Mon., July 13
between 7 a.m.
and 5 p.m.

 

Lancaster Street

(Reg. Rd. 29)
between Union Street and Hamel Avenue

Kitchener

 

Lane Closures

Two-way traffic will be maintained.

Pedestrian traffic will be maintained around the work zone. 

Shoulder Grading 

Click here for further information on  the
MTO website

 

Mon., June 22
for approx. 10 weeks

Lobsinger Line

(Reg. Rd. 15)
between Moser-Young Road and Herrgott Road

Wellesley

Two-way traffic will be maintained via flagging operations.

Pedestrian traffic will be maintained around the work zone.

Road Rehabilitation

Mike Halloran
Project Manager
519-575-4529

 

Mon., June 22 at
9 a.m. to Fri., July 31 (24 hours)

Main Street

(Reg. Rd. 27)
at Water Street

Cambridge

Lane Closures

Two-way traffic will be maintained.

Pedestrian traffic will be maintained around the work zone.

Manhole Rebuild

Lindsay Hemmerling
519-575-4757
ext. 3751

Until Further Notice

Manitou Drive

(Reg. Rd. 69)
between Webster Road and Bleams Road

Kitchener

Load Restriction on Bridge
over Schneider Creek for heavy trucks over 70,000 kg (70 tonnes) or 5 tonnes per axle.

Load
Restriction

Wayne Cheater
Project Manager
519-575-4757
ext. 3183
Thurs., July 2 for 
approx. 5 months

Manitou Drive

(Reg. Rd. 69) 
between Courtland Avenue/ Fairway Road and Bleams Road
(including intersection) 

Kitchener 

Full Closure

Detour via: Westbound - Block Line Road/ Homer Watson Boulevard
Detour via: Eastbound - Wabanaki Drive/ Wilson Avenue / Fairway Road 

Road RehabilitationWayne Cheater
Project Manager 
519-575-4757 
ext. 3183
Mon., Feb. 2 to
Wed., July 8
between 7 a.m.
and 5 p.m.

New Dundee Road

(Reg. Rd. 12)
between Robert Ferrie Drive and Dodge Drive

Kitchener

Lane Closures 

Two-way traffic will be maintained.

Pedestrian traffic will be maintained around the work zone.

Sewer InstallationJosh Graham

519-575-4757
ext. 3312

Thurs., May 21 to
Mon., July 20
between 7 a.m.
and 7 p.m.

Northfield Drive

(Reg. Rd. 22)
between Wissler Road and Bridge Street 

Waterloo

Lane Closures

Two-way traffic will be maintained.

Pedestrian traffic will be maintained around the work zone.

Road Construction

Josh Graham
519-575-4757
ext. 3312

Mon., May 25 to
Mon., July 13
between 7 a.m.
and 5 p.m.

Northfield Drive

(Reg. Rd. 50)
between Weber Street to Conestogo Road

Waterloo

 

Lane Closures

Two-way traffic will be maintained.

Pedestrian traffic will be maintained around the work zone.

Shoulder Grading

Click here for further
information on  the
MTO website

Mon., June 8 to
Thurs., Dec. 31

Northfield Drive

(Reg. Rd. 50)
between Weber Street and Conestogo Road/Colby Drive 

Waterloo

Lane Closures

Two-way traffic will be maintained.

Pedestrian traffic will be maintained around the work zone.

ION Construction

ION Telephone Line
1-844-625-1010

Email connect@rideion.ca

 

Tues., July 7
between 7 a.m.
and 7 p.m.

Northumberland Street

(Reg. Rd. 58)
between C.P.R. Tracks and Greenfield Road

North Dumfries

Lane Closures

Two-way traffic will be maintained.

Pedestrian traffic will be maintained around the work zone

Road Paving

Jim Ellerman
Project Manager 
519-575-4757
ext. 3757

Tues., July 7
between 7 a.m.
and 7 p.m.

 

Peel Street

(Reg. Rd. 4)
between Highway 7/8 and Seyler Street

Wilmot

Lane Closures

Two-way traffic will be maintained.

Pedestrian traffic will be maintained around the work zone

Road Paving 

Jim Ellerman
Project Manager 
519-575-4757
ext. 3757

Mon., June 8
until approx. mid September

Savage Drive

between Franklin Boulevard and Dobbie Drive

 

Cambridge

 

Full Closure

Detour via: Clyde Road/Dobbie Drive

Pedestrian traffic will be maintained around the work zone. 

Road Reconstruction

Frank Kosa
Project Manager
519-575-4757
ext. 3185

Mon., June 29 for approx. 3 weeks

Trussler Road

(Reg. Rd. 70)
between Cedar Creek Road and New Dundee Road / Bridge Street

 

North Dumfries

Full Closure

Detour via: Cedar Creek Road / Northumberland Street / Roseville Road / Fischer-Hallman Road / New Dundee Road

Road Construction

Mike Halloran
Project Manager
519-575-4529

Mon., May 25 to
Mon., July 13
between 7 a.m.
and 5 p.m.

 

University Avenue

(Reg. Rd. 57)
between Bridge Street and Dale Crescent

Waterloo 

Lane Closures

Two-way traffic will be maintained.

Pedestrian traffic will be maintained around the work zone.

Shoulder Grading

Click here for further information on  the
MTO website

Mon., June 22 to
Mon., July 20
between 7 a.m.
and 7 p.m.

University Avenue

(Reg. Rd. 57)
between Weber Street and Highway 85

Waterloo

Lane Closures

Two-way traffic will be maintained.

Pedestrian traffic will be maintained around the work zone.

Road Reconstruction

Kelly Eitel
519-575-4757
ext. 3754

Mon., July 6 to Fri., July 10 between
7 a.m. and 7 p.m.

Victoria Street

(Reg. Rd. 55)
at Margaret Avenue

Kitchener

Lane Closures

Two-way traffic will be maintained.

Pedestrian traffic will be maintained around the work zone.

Bus Pad

Jim Ellerman
Project Manager 
519-575-4757
ext. 3757

Thurs., July 2 or 
Fri., July 3
from 7 p.m. 
to 7 a.m. for 
approx. 2 weeks

Weber Street

(Reg. Rd. 8) 
between Benjamin Road 
and King Street

Waterloo 

Full Closure

Detour via:  King Street / Farmers Market Road / Benjamin Road

Pedestrian traffic will be maintained around the work zone.

Surface AsphaltDon Pletch 
Project Manager 
519-575-4757 
ext. 3182

Thurs., July 2 to 
Fri., July 17 
between 7 a.m. 
and 7 p.m.

Weber Street

(Reg. Rd. 8) 
between Lincoln Road 
and Mackay Crescent

Waterloo

Lane Closures

Two-way traffic will be maintained.

Pedestrian traffic will be maintained around the work zone.

Infrastructure MaintenanceKelly Eitel 
519-575-4757 
ext. 3754

Tues., July 7 at 7 p.m.  to 7 a.m.
Wed., July 8 at 7 p.m. to 7 a.m.

Weber Street

(Reg. Rd. 8)
at University Avenue

Waterloo

Full Closure

Detour via: Marsland Drive / Columbia Street / King Street / Lodge Street

Pedestrian traffic will be maintained around the work zone.

Road Work

Luke Misurka
Project Manager
519-575-4738

Click here to return to top of page.

Upcoming (in alphabetical order by road name)

Date/DurationRoadMunicipalityDetourReasonContact

Mon., July 13 to approx  Fri., July 17

Arthur Street

(Reg. Rd. 21)
between First Street
and Listowel Road

Woolwich

Northbound detour via:

Union Street / First Street / Arthur Street

Southbound traffic will be maintained.

Pedestrian traffic will be maintained around the work zone.

Surface Asphalt

Don Pletch
Project Manager
519-575-4757
ext. 3182

Fri., July 10
between 6 p.m.
and 12 midnight

Benton Street

(Reg. Rd. 6)
between King Street
and Charles Street

Kitchener

Full Closure

Pedestrian traffic will be
maintained around the work zone.

Special Event

 

Stephanie Brasseur
City of Kitchener
519-741-2200
ext. 7373

Patricia Heft
519-575-4743 

Wed., July 8
between 9 a.m.
and 1 p.m.

Bridge Street

(Reg. Rd. 52)

between Lancaster Street/ Carisbrook Drive
and Tyson Drive

Kitchener 

 

Lane Closures

Two-way traffic will be maintained.

Pedestrian traffic will be maintained around the work zone.

Bridge Maintenance

 

Josh Graham
519-575-4757
ext. 3312

Fri., Aug. 7
between 9 a.m.
and 3 p.m.

Cedar Street

(Reg. Rd. 97)
at Davidson Street
between Glenmorris Street
and Kay Street

Cambridge

 

Lane Closure

Two-way traffic will be maintained.

Pedestrian traffic will be maintained around the work zone.

Service Connection

Paul Hilker
City of Cambridge
519-621-0740

Sat., Aug. 8
between 9 a.m.
and 3 p.m.

Cedar Street

(Reg. Rd. 97)
at Davidson Street
between Glenmorris Street
and Kay Street 

Cambridge 

Full Closure

Pedestrian traffic will be maintained around the work zone.

Service Connection 

Paul Hilker
City of Cambridge
519-621-0740

Fri., July 10
between
6 p.m.
and 12 midnight

Duke Street

(Reg. Rd. 63)
between Frederick Street
and Francis Street

Kitchener 

Full Closure

Pedestrian traffic will be maintained
around the work zone.

Special Event 

Stephanie Brasseur
City of Kitchener
519-741-2200
ext. 7373

Patricia Heft
519-575-4743  

Fri., July 10
between 6 p.m.
and 12 midnight

Francis Street

(Reg. Rd. 68)
between Duke Street
and King Street

 

 Kitchener

Full Closure

Pedestrian traffic will be maintained around the work zone.

Special Event

 

Stephanie Brasseur
City of Kitchener
519-741-2200
ext. 7373

Patricia Heft
519-575-4743

Fri., July 10
between 6 p.m.
and 12 midnight

Frederick Street

(Reg. Rd. 6)
between Duke Street
and King Street

 

Kitchener 

Full Closure

Pedestrian traffic will be maintained
around the work zone.

Special Event

 

 

Stephanie Brasseur
City of Kitchener
519-741-2200
ext. 7373

Patricia Heft
519-575-4743

Fri., July 10
between 6 p.m.
and 12 midnight

King Street

(Reg. Rd. 15)
between Victoria Street
and Francis Street

Kitchener

 

Full Closure

Pedestrian traffic will be maintained
around the work zone.

Special Event

 

Stephanie Brasseur
City of Kitchener
519-741-2200
ext. 7373

Patricia Heft
519-575-4743

Fri., July 10
between 9 a.m.
and 5 p.m.

King Street

(Reg. Rd. 15)
at Columbia Street

Waterloo 

Lane Closures

Two-way traffic will be maintained.

Pedestrian traffic will be maintained around the work zone.

 
Building Construction  Kelly Eitel 
519-575-4757 
ext. 3754 

Mon., July 13 to
Fri., Aug. 14
between 9 a.m.
and 3 p.m.

King Street

(Reg. Rd. 15)
between Highway 85
and Northfield Drive

Waterloo

Lane Closures

Two-way traffic will be maintained.

Pedestrian traffic will be maintained around the work zone.

Utility Work

Kelly Eitel
519-575-4757
ext. 3754

Sat. July 18
between 4 p.m.
and 12:30 a.m.

 

King Street

(Reg. Rd. 15)
between Erb Street
and Bridgeport Road

Waterloo

Full Closure

Pedestrian traffic will be maintained around the work zone.

Special Event

Helga Bowman
City of Waterloo
519-886-2310
ext. 30270

Sat., July 11 and
Sun., July 12
between 8 p.m.
and 12 midnight
(each night)

Ottawa Street

(Reg. Rd. 4)
between Elmsdale Drive
and Strasburg Road

Kitchener 

 

Full Closure

Pedestrian traffic will be maintained
around the work zone.

 

Special Event

Stephanie Brasseur
City of Kitchener
519-741-2200
ext. 7373

Patricia Heft
519-575-4743 

Mon., July 13 to
Thurs., Oct. 1
between 7:30 a.m.
and 4:30 p.m.

Sawmill Road

(Reg. Rd. 17)
between Northfield Drive
and Golf Course Road

Woolwich  

Lane Closure

Two-way traffic will be maintained.

Pedestrian traffic will be maintained around the work zone. 

Utility Work  Lindsay Hemmerling 
519-575-4757 
ext. 3751

Thurs., July 9
at 7 p.m. to 7 a.m.

University Avenue

(Reg. Rd. 57)
between Weber Street
and Hwy. 85 

Waterloo

Lane Closure

Two-way traffic will be maintained.

Pedestrian traffic will be maintained around the work zone.

Surface Asphalt

Luke Misurka
Project Manager
519-575-4738

Wed., July 8 to Thurs.,
July 16 between 7 a.m. and 7 p.m.

Victoria Street

(Reg. Rd. 55)
at River Road

Kitchener

Lane Closures

Two-way traffic will be maintained.

Pedestrian traffic will be maintained around the work zone.

Bus Pad

 

Jim Ellerman
Project Manager 
519-575-4757
ext. 3757

 

Fri., July 10
between 6 p.m.
and 12 midnight

Victoria  Street

(Reg. Rd. 55)
between King Street
and Park Street

Kitchener

 

Lane Closure

Two-way traffic will be maintained.

Pedestrian traffic will be maintained
around the work zone.

Special Event 

Stephanie Brasseur
City of Kitchener
519-741-2200
ext. 7373

Patricia Heft
519-575-4743 

Wed., July 8
between 7 a.m.
and 7 p.m.

 

Weber Street

(Reg. Rd. 8)
between Northfield Drive
and Benjamin Road

Waterloo

 

Lane Closures

Two-way traffic will be maintained.

Pedestrian traffic will be maintained around the work zone.

Road Maintenance

Kelly Eitel
519-575-4757
ext. 3754

Click here to return to top of page.


Drivers can help reduce delays for everyone by following a few simple tips:

  • Avoid rush hour travel - Travel before or after the rush to get to and from work if you can, or take alternate routes and save non-essential travel for the less busy times of the day. This will help reduce the overall volume of traffic trying to squeeze through reduced lanes in the construction areas.
  • Carpool - Visit gotravelwise.ca and sign up to find a carpool buddy. Even if you need your car during the day, you can always find a carpool buddy who does not and just a ride to and from work. You will not only help reduce traffic, you can also save money on gas and parking costs too.