Road Closures

Below are links to the Regional Road and Lane Closures:

Below are links to additional information on local roads and highway closures:

Below is a link to Construction information:

Subscribe to eNews at the link below to keep informed when Region road and lane closures are updated:


Regional Municipality of Waterloo - Road and Lane Closure Notification
Effective: Tuesday, April 21, 2015 - 3:45 p.m.

Transportation Division
150 Frederick Street, Kitchener  N2G 4J3
Telephone: 519-575-4558, Fax: 519-575-4453, Email: transportation@regionofwaterloo.ca

New (in alphabetical order by road name) 

Date/Duration  RoadMunicipalityDetourReasonContact

Mon., Apr. 27 to
Wed., July 15
between 9 a.m.
and 3 p.m.

 

Eagle Street

(Reg. Rd. 39)
between Imperial Road
and Hespeler Road

Cambridge

Lane Closures

Two-way traffic will be maintained.

Pedestrian traffic will be
maintained around the work zone.   

Bus Stop Installation  

Samer Inchasi
Project Manager
519-575-4757
ext. 3462 

 

Mon., May 4 to
Wed., July 15
between 9 a.m.
and 3 p.m.

Hespeler Road

(Reg. Rd. 24)
at Munch Avenue/
Isherwood Avenue

 

Cambridge

Lane Closures

Two-way traffic will be maintained.

Pedestrian traffic will be
maintained around the work zone. 

Bus Stop Installation  

 

Samer Inchasi
Project Manager
519-575-4757
ext. 3462  

 Click here to return to top of page.

Existing (in alphabetical order by road name) 

 

Date/DurationRoadMunicipalityDetourReasonContact

Thurs., Apr. 16 to
Wed., Apr. 29
between 9 a.m.
and 3 p.m. 

Benton Street

(Reg. Rd. 6)
between Charles Street and Courtland Avenue 

Kitchener 

Lane Closures

Two-way traffic will be maintained.

Pedestrian traffic will be maintained around the work zone.  

Utility Installation 

Josh Graham
519-575-4757
ext. 3312

Wed., Jan. 14 to
Thurs., Apr. 30
between 7 a.m.
and 3 p.m.

Borden Avenue

(Reg. Rd. 66)
between Courtland Avenue and Charles Street

Kitchener

Lane Closure

Two-way traffic will be maintained.

Pedestrian traffic will be maintained around the work zone.

Utility
Relocation

Steve Sieunarine

519-575-4030

Mon., Mar. 30 to
Thurs., Dec. 31

 

Borden Avenue

(Reg. Rd. 66)
between Courtland Avenue and Huron Spur

Kitchener

Full Closure

Local access will be maintained to all businesses and residences fronting on Borden Avenue

Utilities Relocation

ION Telephone Line
1-844-625-1010

Email connect@rideion.ca

Mon., Apr. 20 to
Tues., Apr. 21
between 9 a.m.
and 3 p.m.  

Bridgeport Road

(Reg. Rd. 9)
between Ellis Crescent and Margaret Avenue 

Waterloo

Lane Closures

Two-way traffic will be maintained.

Pedestrian traffic will be maintained around the work zone. 

Utility Installation 

Kelly Eitel
519-575-4757
ext. 3754 

Tues., Oct. 14 to
Fri., May 1, (2015)

Caroline Street

(Reg. Rd. 9)
between Erb Street
and Allen Street

Waterloo

Full Closure

Detour via:
King Street / Bridgeport Road /
Caroline Street / Erb Street

Utilities
Relocation

ION Telephone Line
1-844-625-1010

Email
connect@rideion.ca

Mon., Jan. 26 to
Thurs., Apr. 30
between 7 a .m.
and 3 p.m.

Charles Street

(Reg. Rd. 64)
between Eby Street
and Ottawa Street

Kitchener

Lane Closure 

Two-way traffic will be maintained.

Pedestrian traffic will be maintained around the work zone.

Utility
Relocation

Steve Sieunarine
519-575-4030

Mon., Feb. 23 to
Sat., May 30
between 9 a.m.
and 3 p.m.

Charles Street

(Reg. Rd. 64)
between Borden Avenue and Kent Avenue

Kitchener

Lane Closures 

Two-way traffic will be maintained.

Pedestrian traffic will be maintained around the work zone.

Utility Relocation

Steve Sieunarine
519-575-4030

Mon., Mar. 23 to
Fri., July 30

Charles Street

(Reg. Rd. 64)
between Benton Street
and Ottawa Street
Kitchener

Full Closure

Detour: Benton Street Weber Street, Ottawa Street

ION Construction

ION Telephone Line
1-844-625-1010

Email
connect@rideion.ca

Thurs., Apr. 9 to
Fri. July 31 

Charles Street

(Reg. Rd. 64)
between Victoria Street and Benton Street

Kitchener

Full Closure

Detour via: Ottawa Street, Weber Street, Victoria Street.

Local access will be maintained to all businesses and residences fronting on  Charles Street.

Utilities Relocation 

ION Telephone Line 1-844-625-1010

Email connect@rideion.ca

Thurs., Apr. 9 to
Fri., May 8 

Charles Street

(Reg. Rd. 64)
at Gaukel Street

Kitchener

Full Closure 

Pedestrian traffic will be maintained around the work zone.

Utilities Relocation  

ION Telephone Line 1-844-625-1010

Email connect@rideion.ca

Mon., Apr. 20 at 7 a.m. to Wed., Apr. 29 at 5 p.m.

Courtland Avenue

(Reg. Rd. 53)
at Borden Avenue
Kitchener

Full Closure

Detour via: Stirling Avenue/King Street/Ottawa Street

Pedestrian traffic will be maintained around the work zone.  

Utilities Relocation 

ION Telephone Line 1-844-625-1010

Email connect@rideion.ca

Until Further Notice

Covered Bridge Drive

West Montrose
Covered Bridge

Woolwich

Load Restriction on Bridge for
heavy trucks (over 3,000 kg).

Light vehicles permitted.

Preservation
of Historical Structure

Shawn Buckley
519-575-4093

Wed., Apr. 15 to
Fri., Apr. 24
between 9 a.m.
and 3 p.m.

Eagle Street

(Reg. Rd. 39) at Shettleston Drive

Cambridge 

Lane Closure

Two-way traffic will be maintained.

Pedestrian traffic will be maintained around the work zone.

 Hydro Works

 

Lindsay Hemmerling 519-575-4757
ext. 3751

Mon., Apr. 6 to
Fri., May 1
between 9 a.m.
and 3 p.m.

 

Fountain Street

(Reg. Rd. 17)
between Maple Grove Road and Cherry Blossom Road

Cambridge

Lane Closure

Two-way traffic will be maintained.

Pedestrian traffic will be maintained around the work zone. 

Utility Installation

Lindsay Hemmerling
519-575-4757
ext. 3751

Thurs., Mar. 19 to
Sun., May 31
between 9 a.m.
and 3 p.m.

Franklin Boulevard

(Reg. Rd. 36)
between Clyde Road
and Pinebush Road

Cambridge

Lane Closure

Two-way traffic will be maintained.

Pedestrian traffic will be maintained around the work zone.

Hydro
Relocation

Lindsay Hemmerling
519-575-4757
ext. 3751

Mon., Apr. 6 to 
Thurs., Apr. 30
between 9 a.m.
and 3 p.m.

Franklin Boulevard

(Reg. Rd. 36)
between McLaren Avenue and Dundas Street

Cambridge

Lane Closure

Two-way traffic will be maintained.

Pedestrian traffic will be maintained around the work zone.

Utility Relocation

Lindsay Hemmerling
519-575-4757
ext. 3751

Mon., Apr. 6 to
Fri., June 12
between 9 a.m.
and 3 p.m.

Franklin Boulevard

(Reg. Rd. 36)
at Sheldon Drive

Cambridge 

Lane Closures

Two-way traffic will be maintained.

Pedestrian traffic will be maintained around the work zone.

Utility Relocation

Lindsay Hemmerling
519-575-4757
ext. 3751

Mon., Mar. 16 to
Fri., Apr. 24
between 7 a.m.
and 5 p.m.

Herrgott Road

(Reg. Rd. 10)
between Broadway Street
and Geddes Street

 Wellesley

Lane Closures

Two-way traffic will be maintained.

Pedestrian traffic will be maintained around the work zone.

Utility Work

Josh Graham
519-575-4757
ext. 3312

Mon., Mar. 23 to
Fri., Apr. 24
between 9 a.m.
and 3 p.m.

Hespeler Road

(Reg. Rd. 24)
between Munch Avenue and Abbotsford Street

 Cambridge

Lane Closure

Two-way traffic will be maintained.

Pedestrian traffic will be maintained around the work zone.

Hydro Relocations 

Lindsay Hemmerling
519-575-4757
ext. 3751

Mon., Apr. 13 to
Wed., July 15
between 9 a.m.
and 3 p.m. 

Hespeler Road

(Reg. Rd. 24)
at Coronation Boulevard/ Dundas Street 

Cambridge

Lane Closures 

Two-way traffic will be maintained.

Pedestrian traffic will be maintained around the work zone. 

Bus Stop Installation 

Samer Inchasi
Project Manager
519-575-4757
ext. 3462 

Mon., Apr. 13 to
Wed., July 15
between 9 a.m.
and 3 p.m. 

Hespeler Road

(Reg. Rd. 24)
at Can-Amera Parkway

Cambridge

Lane Closures 

Two-way traffic will be maintained.

Pedestrian traffic will be maintained around the work zone. 

Bus Stop Installation 

Samer Inchasi
Project Manager 
519-575-4757
ext. 3462 

Mon., Apr. 13 to
Fri., Oct. 30
starting at 7 a.m. 

Highland Road

(Reg. Rd. 6)
between Patricia Avenue and Westmount Road

Kitchener

Lane Closures

Two-way traffic will be maintained.

Pedestrian traffic will be maintained around the work zone.  

Reconstruction

Mike Halloran
Project Manager
519-575-4529

Mon., Mar. 23 to
Thurs., July 30

King Street

(Reg. Rd. 15)
between Union Street
and Victoria Street
 Kitchener

Full Closure

Detour: Union Street, Weber Street, Victoria Street

ION Construction

ION Telephone Line 1-844-625-1010

Email
connect@rideion.ca

Mon., Apr. 20 to 
Thurs., Aug. 20
between 7 a.m.
and 7 p.m.

King Street

(Reg. Rd. 15)
between Conestogo Road and Weber Street
Waterloo

Lane Closures

Two-way traffic will be maintained.

Pedestrian traffic will be maintained around the work zone.   

Road Reconstruction 

Kelly Eitel
519-575-4757
ext. 3754 

 

 

Mon., Jan. 19 to
Tues., June 30
between 7 a.m.
and 3 p.m.

Manitou Drive 

(Reg. Rd. 69)
between Fairway Road /
Courtland Avenue and
Bleams Road

Kitchener

Lane Closures  

Two-way traffic will be maintained. 

Pedestrian traffic will be maintained around the work zone.

Utility
Relocation
Steve Sieunarine
519-575-4030
Until Further Notice

Manitou Drive

(Reg. Rd. 69)
between Webster Road and Bleams Road

Kitchener

Load Restriction on Bridge
over Schneider Creek for heavy trucks over 70,000 kg (70 tonnes) or 5 tonnes per axle.

Load
Restriction

Wayne Cheater
Project Manager
519-575-4757
ext. 3183
Mon., Feb. 2 to
Wed., July 8
between 7 a.m.
and 5 p.m.

New Dundee Road

(Reg. Rd. 12)
between Robert Ferrie Drive and Dodge Drive

North Dumfries

Lane Closures 

Two-way traffic will be maintained.

Pedestrian traffic will be maintained around the work zone.

Sewer InstallationJosh Graham

519-575-4757
ext. 3312

Tues., Apr. 7 to
Fri., May 29
between 7 a.m.
and 6 p.m. 

Ottawa Street

(Reg. Rd. 4)
between Charles Street and Mill Street

Kitchener

Lane Closure

Two-way traffic will be maintained.

Pedestrian traffic will be maintained around the work zone.

Hydro Pole Relocation

Steve Sieunarine
519-575-4030

Tues., Apr. 21
between 9 a.m.
and 3 p.m.

Ottawa Street

(Reg. Rd. 4)
between Weber Street and McKenzie Avenue

Kitchener

Lane Closure

Two-way traffic will be maintained.

Pedestrian traffic will be maintained around the work zone. 

Monitoring Well Sampling 

Lindsay Hemmerling 519-575-4757
ext. 3751  

Thurs., Apr. 16 to
Thurs., Apr. 30
between 9 a.m.
and 3 p.m. 

Water Street

(Reg. Rd. 24)
between Myers Road
and Waynco Road 

Cambridge 

Lane Closure

Two-way traffic will be maintained.

Pedestrian traffic will be maintained around the work zone. 

Monitoring Well Sampling 

Lindsay Hemmerling 519-575-4757 ext. 3751 

Thurs., Apr. 24,
(2014) to Thurs.,
Apr. 30, (2015)
between 7 a.m.
and 7 p.m.

Weber Street

(Reg. Rd. 8)
between College Street and Union Street

Kitchener

Lane Closure 

Two-way traffic will be maintained.

Pedestrian traffic will be maintained around the work zone. 

Road
Widening
Peter Linn

Project Manager
519-575-4757
ext. 3773

Steve Sieunarine
519-575-4030

Fri., Apr. 10 to Mon., Apr. 27 Saturdays and Sundays only between 8 a.m. and 6 p.m. 

Weber Street

(Reg. Rd.8)
between Borden Avenue and Queen Street
Kitchener

Lane Closures

Two-way traffic will be maintained.

Pedestrian traffic will be maintained around the work zone. 

Utility Investigations 

Josh Graham
519-575-4757
ext. 3312

Click here to return to top of page.

Upcoming (in alphabetical order by road name)

Date/DurationRoadMunicipalityDetourReasonContact

Wed., Apr. 22 between 9 .m. 
and 5 p.m. 

Erb Street

(Reg. Rd. 9)
at Euclid Avenue 

Waterloo 

Lane Closures

Two-way traffic will be maintained.

Pedestrian traffic will be maintained around the work zone.  

Watermain Repair 

Kelly Eitel
519-575-4757
ext. 3754 

Mon., Apr. 27 to
Fri., May 8
between 9 a.m.
and 3 p.m.  

Erb Street

(Reg. Rd. 9)
between Caroline Street
and Menno Street 

Waterloo

Lane Closures

Two-way traffic will be maintained.

Pedestrian traffic will be maintained around the work zone. 

Road Reconstruction

Kelly Eitel
519-575-4757
ext. 3754

Wed., Apr. 22 to Thurs., Oct. 22 

Fountain Street

(Reg. Rd. 28) overpass across Highway 401 

 

Cambridge 

Full Closure

Detour via: Eastbound - Eagle Street to Speedsville Road (cars) or Hespeler Road (trucks) to Maple Grove Road.

Detour via: Westbound - Shantz Hill Road to King Street to Sportsworld Drive to Maple Grove Road. 

(Ministry of Transportation - Ontario)

MTO Bridge Rehabilitation

Click here for further information on  the MTO website

Mon., May 25 to
Fri., May 29
between 9 a.m.
and 3 p.m.

Hespeler Road

(Reg. Rd. 24)
between Munch Avenue
and Eagle Street/Pinebush Road

 Cambridge

Lane Closure

Two-way traffic will be maintained.

Pedestrian traffic will be maintained 
around the work zone.

Flower Bed
Maintenance

Bert Klein-Horsman
City of Cambridge
519-653-5470

Lindsay Hemmerling
519-575-4757
ext. 3751

Mon., Apr. 27 to
Wed., Apr. 29
between 9 a.m.
and 3 p.m. 

King Street

(Reg. Rd. 8)
between Limerick Drive/
Gateway Park and Highway 401

Kitchener

Lane Closures

Two-way traffic will be maintained.

Pedestrian traffic will be maintained around the work zone. 

Monitoring Well Sampling 

Lindsay Hemmerling
519-575-4757
ext. 3751 

Tues., Apr.28
between 9 a.m. and 12:00 noon

Lancaster Street

(Reg. Rd 29)
between Union Street and Hamel Avenue

Kitchener

Lane Closures

Two-way traffic will be maintained.

Pedestrian traffic will be maintained around the work zone.  

Maintenance for Water Services 

Josh Graham
519-575-4757
ext. 3312

 

 

Fri., Apr. 24 to
Sat., Apr. 25
between 9 a.m.
and 3 p.m.

Myers Road

(Reg. Rd. 43)
at Gatehouse Drive

 

Cambridge

Lane Closures

Two-way traffic will be maintained.

Pedestrian traffic will be maintained around the work zone. 

Valve Box Repair 

Lindsay Hemmerling
519-575-4757
ext. 3751  

Click here to return to top of page.


Drivers can help reduce delays for everyone by following a few simple tips:

  • Avoid rush hour travel - Travel before or after the rush to get to and from work if you can, or take alternate routes and save non-essential travel for the less busy times of the day. This will help reduce the overall volume of traffic trying to squeeze through reduced lanes in the construction areas.
  • Carpool - Visit gotravelwise.ca and sign up to find a carpool buddy. Even if you need your car during the day, you can always find a carpool buddy who does not and just a ride to and from work. You will not only help reduce traffic, you can also save money on gas and parking costs too.
  • Take transit - Go to grt.ca and check out schedules for GRT routes that can get you to your destination. The bus needs to use the road too, but if more people take transit and leave their cars behind, there will be less traffic building up in construction areas.

To find more information about how you can change the way you travel around Waterloo Region, visit our cycling, walking, carpooling and transit pages.