Project number: 07609 | Updated: October 2026
The Region of Waterloo is installing a single-lane roundabout at the intersection of Roseville Road and Edworthy Side Road in North Dumfries. This design was selected based on feedback received during public engagement, along with technical analysis and internal review.
This project aims to improve safety, traffic flow, and intersection operations for all road users.
This work includes:
- Construction of a single-lane roundabout
- Installation of storm sewers, road base, curb and gutter
- Asphalt removal and replacement
- Ditch grading and profiling
- Installation of additional lighting within the project limits.
Construction is scheduled to begin in June 2026 and is expected to be completed by November 2026. Work will be completed in phases:
Schedule
Public Engagement- 2023
Design and planning: 2024–2026
Construction: June 2026–November 2026
Surface asphalt: 2027
Note: timing may be affected by weather conditions and changing project scope; updates will be posted as needed.
Budget
$4,058,000
Contact
Daniel Di Pietro, P.Eng.
Engineer, Region of Waterloo
dadipietro@regionofwaterloo.ca
Service First Contact Centre: 519-575-4400
Getting around during construction
Construction has entered the final phase, with work now focused on the north side of Roseville Road. The south leg of the roundabout and the south side of Roseville Road have been paved with base asphalt.
Current traffic impacts include:
- Edworthy Side Road is closed at Roseville Road to all traffic.
- Westbound Roseville Road is closed between Whistle Bare Road and Dickie Settlement Road.
- Eastbound traffic through the construction area remains open; however, road users are encouraged to use the signed detour to help reduce congestion.
- All trucks must use the signed detour.
View detour map . Please follow all posted signage and allow extra travel time when travelling through the area.