Construction and Road Closures
The Region of Waterloo has many construction projects every year. These include resurfacing, reconstruction, widening, new road construction. Updates on projects currently underway and future planned works are listed here.
To report a problem or a concern with construction or road closures, call 519-575-4400 (or TTY for the deaf and hard of hearing: 519-575-4608.)
List and map of road closures | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
A list of Waterloo Region road closure information. An up-to-date map including road closure information for the Region of Waterloo and the cities of Cambridge, Kitchener and Waterloo. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Current construction projects | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
The projects and schedules are based on the program approved by Regional Council. The type, location or timing of these works may change or may not occur at all. These changes may occur before the start of the works or as the works are being carried out. Typical practice with reconstructing roads is to pave to base course asphalt, with surface course asphalt placed on the road the following year.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Future construction projects |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
The projects are based on the 10-Year Capital Program approved by Regional Council. These works may change or may not occur at all.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Tips to reduce delays during construction | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|