Construction

The Region of Waterloo is responsible for building and improving sidewalks, multi-use paths, bike lanes, roads and underground infrastructure on regional roads. Once a project is complete, the Region maintains on-road bike lanes, roads and underground infrastructure and the City or Township maintains the sidewalks and multi-use paths. This work is essential not only to meet the needs of a growing population but also to support our sustainability goals by expanding our active transportation network. 

Road closures GRT detours Project engagement — EngageWR Report an issue — Regional road construction Regional roads

The projects on this map make up the Region's 10-year Transportation Capital Program. Changes to the project scope, timing, and budget may occur, and the project list will be updated as those changes occur.

View the map in full screen Learn how to use the map

Loading News Feed...

Active road construction projects

Cambridge Kitchener Waterloo North Dumfries  Wellesley Wilmot Woolwich 

Cambridge

ProjectWhereCurrent status
Ainslie Street Water St N to Water St S Design
East Boundary Road Highway 8 to Wesley Blvd Design
Can-Amera Parkway Conestoga Boulevard to Franklin Boulevard Design
Fountain Street Fairway Rd N/Kossuth Rd to Cherry Blossom Rd Design
Franklin Boulevard and Bishop Street North Franklin Blvd at Bishop St N Construction
GRT stop and shelter changes Various locations across the Region Annual construction
Intersection improvements Various locations across the Region Annual construction
Main Street Franklin Blvd to 1050 Main St Design
Maple Grove Road phase one Beaverdale Rd to Vondrau Dr Construction/planning
McQueen Shaver Boulevard Franklin Blvd to Highway 8 Design
Myers Road Water St to Branchton Rd Design
St. Andrews Storage and Pumping Station

266 St. Andrews Street

Design
Watermain improvements

Mill Creek Rd (Timber Creek to Samuelson)

Samuelson St (Mill Creek to Elgin)

Elgin St N (Linnwood to Hilltop)

Complete
Water Street North

Ainslie St N to Park Hill Rd

Design
Water Street South

Ainslie St S to Myers Rd

Design

Kitchener

ProjectWhereCurrent status
Bleams Road Fischer-Hallman Rd to Trussler Rd Complete
Fischer-Hallman Road Bleams Rd to Plains Rd Design
Freeport Bridge on King Street E Riverbank Dr to Stonegate Dr Design
GRT stop and shelter changes Various locations across the Region Annual construction
Highway 7/8 cycling and pedestrian bridge Strasburg Rd/Chandler Dr to Avalon Pl Complete
Homer Watson Boulevard and Block Line Road Homer Watson Blvd at Block Line Rd Construction
Intersection improvements Various locations across the Region Annual construction
Lancaster Street Wellington St to Bridgeport Rd Utility relocations
New Dundee/Fischer-Hallman Road intersection

New Dundee Rd at Fischer-Hallman Rd

Design
New Dundee Road

Pinnacle Dr to Robert Ferrie Dr

Surface asphalt
Ottawa Street Fischer-Hallman Rd to Mowat Blvd Construction
River Road/Bleams Road King St to Manitou Dr Design/Construction
Schneider Creek Path Manitou Dr west and Block Line Rd Design
Victoria Street Fischer-Hallman Rd to Lawrence Ave Phase 1 complete
Westmount Road Fischer-Hallman Rd to Block Line Rd Design

Waterloo

ProjectWhereCurrent status
Bridgeport Road/Caroline Street and Erb Street King St to Erb St Design
Columbia Street King St to Westmount Rd Tender
Erb Street Fischer-Hallman Rd to Wilmot Line Design
Erb Street West and Ira Needles Boulevard Erb St W at Ira Needles Blvd Construction
Fischer-Hallman/Bearinger Road Columbia St W to Westmount Rd N Complete
GRT stop and shelter changes Various locations across the Region Annual construction
Intersection improvements Various locations across the Region Annual construction
Westmount Road Victoria St to Erb St Study
William Street water supply William St. Pumping Station Complete
University Avenue Albert St to Weber St Design

North Dumfries

ProjectWhereCurrent status
Branchton Meadows Water Treatment Plant 1 Hughson Ln Design
Cedar Creek Water Tower 1233 Cedar Creek Rd Design
Dickie Settlement Road and Roseville Road Dickie Settlement Rd at Roseville Rd Design
Fischer-Hallman Road and New Dundee Road intersection Fischer-Hallman Rd at New Dundee Rd Design
Roseville Road and Fischer-Hallman Road 0.6 km west of Fischer-Hallman Rd to 0.4 km east of Fischer-Hallman Rd Design

Wellesley

ProjectWhereCurrent status
G2G Rail Trail pedestrian bridge Powell Rd to Line 86 Study

Wilmot

ProjectWhereCurrent status
Erbs Road Sandhills Rd to Erbs Rd Bridge Design
Trussler Road Bleams Rd to Yellow Birch Dr Study

Woolwich

ProjectWhereCurrent status
Arthur Street Kenning Pl to South St E Design
Fountain Street North 850m south of Flanders Rd Construction
Maryhill Road St. Charles Street to the Waterloo/Wellington boundary Design
Sawmill Road and Ebycrest Road Sawmill Rd at Ebycrest Rd Design
Scheifele Bridge Conestogo River Site preparation
West Montrose Covered Bridge Hill St to River's Edge Dr Construction

Contact Us