  • Construction notice: Main Street Bridge, Cambridge, August–September 2025 Melville Street to Water Street About the project The Region of Waterloo is completing maintenance work on the Main Street Bridge in Cambridge. This work includes small concrete repairs and applying a protective coating to parts of the bridge.
  • Construction notice: West Montrose Covered Bridge, Woolwich, August 2025–December 2026 About the project The Region of Waterloo is rehabilitating the West Montrose Covered Bridge in Woolwich. This project includes replacing worn-out wood, the roof and siding, removing the old steel support, repairing the bridge foundation and strengthening key parts of the structure.
  • Construction notice: New Dundee Road, Kitchener, June–December 2025 Pinnacle Drive to Reichert Drive About the project The Region of Waterloo has started construction on New Dundee Road in Kitchener. This year’s work will be between Reichert Drive and Pinnacle Drive.
  • Construction notice: Victoria Street Phase One, Kitchener, July–November 2025 Fischer-Hallman Road to Lawrence AvenueAbout the projectThe Region of Waterloo is improving Victoria Street between Fischer-Hallman Road and Lawrence Avenue in Kitchener. Phase one includes the Fischer-Hallman Road and Westmount Road intersections.
  • Construction notice: Roundabout pedestrian safety pilot Homer Watson Boulevard and Block Line Road, Kitchener Franklin Boulevard and Bishop Street North, Cambridge Erb Street West and Ira Needles Boulevard/Erbsville Road, WaterlooAbout the projectThe Region of Waterloo is improving three existing roundabouts in Kitchener, Cambridge and Waterloo. This work is part of the roundabout pedestrian safety pilot that is trialing three different crosswalk safety features to help anyone walking or rolling feel more safe.
  • Construction notice: Bridgeport Bridge, Kitchener, July 10–September 2025 Lancaster Street to Tyson Drive About the project The Region of Waterloo is completing maintenance work on the Bridgeport Bridge in Kitchener. This work includes small concrete repairs and applying a protective coating to parts of the bridge.
  • Construction update: Ottawa Street, Kitchener, July–November, 2025 Pinedale Drive to Westmount Road Project update As part of the Ottawa Street improvements project, the Region of Waterloo is starting stage two of this year’s work between Westmount Road and Pinedale Drive. In this stage we will replace a culvert at Shoemaker Creek, continue the new roundabout at the Ottawa Street and Westmount Road intersection, replace underground infrastructure, add new multi-use paths on both sides of Ottawa Street and upgrade the streetlighting.
  • Construction notice: Myers Road, Cambridge, July 2025 Gatehouse Drive/Lisbon Pines Drive to Branchton Road About the project The Region of Waterloo is improving the pedestrian crossings on Myers Road between Branchton Road and Gatehouse Drive/Lisbon Pines Drive. This includes a raised pedestrian crossing in front of Moffat Creek school with curb and gutter, pavement markings, signage, and a “speed hump” to provide greater visibility of the crossing area and help slow down traffic.
  • Construction notice: Fairway Road, Kitchener, July–August 2025 Lackner Boulevard to Pebblecreek Drive About the project The Region of Waterloo is improving Fairway Road between Lackner Boulevard and Pebblecreek Drive in Kitchener. This work includes: Replacing the sidewalk with a new multi-use path on the north side of the street Removing the traffic island at Lackner Boulevard Reconfiguring the sidewalk ramps and pavement markings at the intersections Relocating light poles Installing signage Landscaping These improvements will make it easier and safer for pedestrians and cyclists to get around in this area.
  • Construction notice: Maple Grove Road, Cambridge, June–December 2025 Hespeler Road to Beaverdale RoadAbout the projectThe Region of Waterloo is starting phase one of the Maple Grove Road improvements between Hespeler Road and Beaverdale Drive in Cambridge. This work includes: New asphalt multi-use paths on both sides of the street and bridgeNew roundabout at Hespeler Road and Maple Grove Road intersectionWidening from two to four lanesRehabilitating Ellis (Chilligo) Creek bridgeStormwater and drainage improvementsStreet lighting improvementsTiming — starts June 2025Construction will be completed in stages starting with phase one in June until the fall.
Subscribe

Contact Us

Region of Waterloo
150 Frederick St.
Kitchener, Ontario N2G 4J3
Telephone: 519-575-4400
Fax: 519-575-4481

For general inquiries:
Regionalinquiries@regionofwaterloo.ca