Schneider Creek Path

Overview
Project number: 07623 | Updated: January 2025
The Region of Waterloo is planning to construct a multi-use path connection between Manitou Drive west to an existing path on Block Line Road in Kitchener. The two-way multi-use path will be approximately 1.3 km long and 3 meters wide to accommodate walking, cycling and other modes of active transportation.
The path will include a pedestrian/cycling bridge over Schneider Creek, a railway crossing, and connections to existing trails nearby. The path will also complete a missing section of the Trans Canada Trail, making that trail more fluid and enjoyable through the Kitchener section.
This path will enhance community connectivity by providing a safe and efficient route for both recreational users and those commuting for active transportation.
Schedule
Environmental assessment: 2023–2025
Design and planning: Summer 2025–Winter 2026
Construction: Spring–Winter 2026
Note: timing may be affected by weather conditions and changing project scope; updates will be posted as needed.
Budget
$6,100,000
Contact
Jeff Nyenhuis, P.Eng.
Senior Engineer, Region of Waterloo
jnyenhuis@regionofwaterloo.ca
Service First Contact Centre: 519-575-4400; for deaf and hard of hearing (TTY) call 519-575-4608
Public engagement
This project is open for input between February 24 and March 17, 2025. Your input will be considered by the project team along with technical requirements to create a detailed design of the path.
Project details
Project studies and resources
- Alignment options decision matrix (November 2024)
Additional notes
This project supports the Region of Waterloo's strategic focus areas(External link): Climate aligned growth and Homes for all
Contact Us