Regional Water System Upgrades in Cambridge and North Dumfries
This project was previously referred to as the West Cambridge water systems upgrades.
Status: design
The aim of the Class EA is to confirm the necessary infrastructure requirements and system upgrades needed to strengthen the overall capacity and resiliency of the supply, storage, and transmission within the Cam 3 and Lloyd Brown pressure zones, and to increase the efficiency and flexibility of system operations.
Project file:
- Project File Report (appendices available upon request)