Bleams Road and Trussler Road
On this page:
Bleams Road (Trussler to Fischer-Hallman Road)
Project number: 05705 | Updated: August 2026
The Region has finished the reconstruction of Bleams Road from Trussler Road to Fischer-Hallman Road in Kitchener. This work included:
- New multi-use path throughout project limits
- New roundabouts at Commonwealth, Donnenwerth, Isaiah and Trussler intersections
- New watermain
- New storm sewer
- Upgraded a section of sanitary sewer
- Replaced road structure and asphalt
These improvements make it easier and safer for all residents to get around, whether by car, public transit, bike, or foot.
Schedule
Environmental assessment: 2021–2022
Design and planning: 2023
Construction: May 2024–December 2025
Budget
$1,000,000 (2026)
Contact
David Di Pietro, P.Eng.
Senior Engineer, Region of Waterloo
DDiPietro@regionofwaterloo.ca
Service First Contact Centre: 519-575-4400
Contractor
Ontario Ltd. O/A T. Musselman Excavating Limited
Getting around during construction
The Bleams road is open to through traffic. Over the construction period, we have:
- Urbanized Bleams Road from Fischer-Hallman Road to Trussler Road (installed curb and gutter and storm sewer)
- Installed multi-use pathways for active transportation on both sides of the roadway
- Installed 4 new roundabouts at Commonwealth St, Donnenwerth Dr, Isaiah Dr, and Trussler Rd, all with raised pedestrian crossings.
Public engagement
The public was encouraged to participate in this project during the environmental assessment in 2022. See details of that engagement on the EngageWR project page.
Trussler Road (Knetchel Court to Nathalie Street)
Project number: 05705 | Updated: August 2026
The Region of Waterloo is improving Trussler Road to support the growing community and improve the road network in the area.
The work includes the installation of a sanitary sewer on Trussler Road from Nathalie St to Knechtel Court. as well as improvements to the roadway and transportation infrastructure.
Schedule
Design and planning: 2025
Construction: September 2026 - December 2026
Budget
TBC
Contact
David Di Pietro, P.Eng.
Senior Engineer, Region of Waterloo
DDiPietro@regionofwaterloo.ca
Service First Contact Centre: 519-575-4400
Getting around during construction
Construction is expected to begin on or about September 28 and will be completed in three stages. Stage 1 will involve a lane shift for approximately 27 days, with traffic shifted within the existing roadway between Rickert Way/Nathalie Street and Ottawa Street South/Bleams Road. Two-way traffic will be maintained, and no road closure or detour will be required.
Stage 2 will involve a northbound closure, followed by Stage 3, which will involve a full closure. Details about each stage, including traffic impacts and detour routes, will be shared as construction progresses.
Project details
Project studies and resources
Construction activities
- Construction notice (May 2024)
- Construction notice (March 2025)
- Construction update (April 2025)
- Construction update (April 2026)
This project supports the Region of Waterloo's strategic focus areas: Climate aligned growth and Equitable services and opportunities.