Erb Street Reservoir

Overview

Project number: 04196 | Updated: October 2026

The Region of Waterloo is making necessary upgrades to the Erb Street Reservoir located in Waterloo. This reservoir supplies water and backup water storage to parts of Waterloo and St. Agatha. This project is focused on maintaining existing Regional water infrastructure.

These upgrades require temporarily shutting down the Erb Street Reservoir, water supply will continue to be maintained through alternative sources to ensure uninterrupted service.

Schedule

Planning: 2026
Construction: November 2026 – May 2027

Note: Timing of construction could change due to what is found during the inspection.

Budget

TBC

Contact

Ben Harvey, C.E.T., PMP
Project Manager, Region of Waterloo
BHarvey@regionofwaterloo.ca

Service First Contact Centre: 519-575-4400

Construction impacts

Starting November 2, 2026, the Region will be preparing for the shutdown and isolation of the Erb Street Reservoir. Once isolated, contractors will be performing upgrades to valves and piping, instrumentation and structural repairs. Most of the work will be performed within the reservoir.  

Exterior construction activities will be limited to the front of the reservoir at 990 Erb Street West for a short duration starting in November 2026. Impacts on Erb Street traffic is expected to be minimal and for short durations only.  

Please note: Water supply will be maintained through alternative sources.  

Contact Us

Region of Waterloo HQ
150 Frederick St.
Kitchener, Ontario N2G 4J3
Telephone: 519-575-4400
Fax: 519-575-4481

For general inquiries:
Regionalinquiries@regionofwaterloo.ca

Other Main Region Locations

Cambridge Main Office
150 Main St.
Cambridge, ON N1R 6P9

Waterloo Main Office
99 Regina St. S.
Waterloo, ON N2J 4V3