New Dundee Road
On this page:
Pinnacle Drive to Reichert Drive
Project number: 07284 | Updated: June 2026
In 2025, the Region of Waterloo has completed the first phase of construction on New Dundee Road between Reichert Drive and Pinnacle Drive in Kitchener. This work included:
- New roundabout at Robert Ferrie Drive and New Dundee Road
- New left turn lane for eastbound traffic to Pinnacle Drive from New Dundee Road
- Widening the road to add paved shoulders on the sides
- New multi-use path and pedestrian handrails on the north side of the road
- Installation of new underground sanitary sewer and watermain
This year, phase 2 will begin to complete the remaining activities which includes upgrades to the concrete sidewalk, curb and gutter, grass and landscaping restoration, final surface asphalt coating and painting.
Schedule
Design and planning: 2022
Construction (phase 1): Summer - Fall 2025
Construction (phase 2): June 2026
Note: timing may be affected by weather conditions and changing project scope; updates will be posted as needed.
Getting around during construction
Construction on New Dundee Road is now complete. The Region will complete final construction activities in June 2026.
New Dundee Road between Reichert Drive and Pinnacle Drive will be closed overnight on June 23 and 24 (7 p.m. to 6 a.m.). During these closures, there will be no access to New Dundee Road from Pinnacle Drive, Robert Ferrie Drive, or Reichert Drive.
Outside of the overnight closures, New Dundee Road will remain open to two-way traffic, with temporary lane restrictions at times.
During overnight closures, local traffic should use the following routes to access Doon South:
- Eastbound: Stauffer Woods Trail
- Westbound: Conestoga College Drive and Pinnacle Drive
Text NWDE to 57555 to receive the latest updates on the project. Standard messaging rates apply.
Budget
$4,087,000
Contact
Romeo Uy, P.Eng.
Project Manager, Region of Waterloo
ruy@regionofwaterloo.ca
Service First Contact Centre: 519-575-4400
Project resources and studies
- Information report (January 2022)
- Project approval report (Apil 2022)
Fischer-Hallman Road at New Dundee Road
Project number: 05284 | Updated: June 2026
The Region of Waterloo is installing a roundabout at the intersection of New Dundee Road and Fischer-Hallman Road, located at the boundary between the City of Kitchener (north side) and the Township of North Dumfries (south side). The work includes:
- Installation of storm sewers
- Installation of a base layer of the road
- Curb and gutter
- Asphalt removal and replacement
- New ditch grading and profiling
- Additional street lighting within the project limits.
This decision is based on technical studies and input received from the public through engagement in 2022.
Schedule
Design and planning: 2022
Detailed design: 2024–2025
Construction: July - November 2026
Note: timing may be affected by weather conditions and changing project scope; updates will be posted as needed.
Budget
$2,957,000
Getting around during construction
Construction of the roundabout will be completed in two stages to reduce traffic impacts. In Stage 1, the norther section of Fischer-Hallman Road will be closed, while Stage 2 will involve closure of the southern section. Local access and traffic movements will be maintained where possible throughout construction.
Detours will be in place during each stage. Southbound traffic on Fischer-Hallman Road will be redirected via Huron Road and Trussler Road in Stage 1. In Stage 2, eastbound traffic on New Dundee Road will be detoured via Trussler Road to Cedar Creek, while access to the gas station from the south will be maintained.
During construction, traffic may occasionally be required to travel on a gravel surface and may be controlled by traffic control staff.
Contact
Steve Yonemitsu, P.Eng.
Project Manager, Region of Waterloo
syonemitsu@regionofwaterloo.ca
Service First Contact Centre: 519-575-4400
Project resources and studies
- Public engagement letter (February 2022)
- Design drawings (January 2022)
- Project map (January 2022)
- Information report (March 2022)
- Approval report (October 2022)
- Construction activities (June 2026)