Roads and infrastructure maintenance | 2026
This page provides an overview of the Region's 2026 road and infrastructure maintenance program. This is an annual program to improve and address aging infrastructure and repairs needed on roads, GRT bus stops, intersections, multi-use paths and sidewalks.
On this page:
- Roads and active transportation maintenance
- Bridge maintenance
- Intersection and traffic signal improvements
- GRT bus improvements
Roads and active transportation maintenance
More information will be made available soon.
Bridge maintenance
More information will be made available soon.
Intersection and traffic signal improvements
Cambridge locations
- Concession Street at Cameron Street (Type B PXO with rapid flashers and overhead signage)
- George Street North and Blair Road (new traffic signals, ladder crosswalks, and improved pedestrian landing areas)
- Dundas Street South at Fitzgerald Drive, Cambridge (New crossride installation)
Waterloo locations
- University Avenue West and Lester Street (upgrading the existing Intersection Pedestrian Signal to a Full Traffic Signal (all directions), ladder crosswalks, and improved pedestrian landing areas)
- Northfield Drive East and Bridge Street (New crossride installation on the south leg of the intersection for the existing multi-use trail, including protection intersection improvements by realigning/reducing crosswalk widths on the other legs of the intersection)
- Erb Street West and Caroline Street (PROVISIONAL – Subject to Final Design Approval) – intersection improvements, including adding crossrides on the west, north, and east legs of the intersection. It also includes enlarging the existing right-turn channelized island and relocating one train control arm to make it safer and provide more space for pedestrians/cyclists while trying to get through this intersection.
Kitchener locations
- Victoria Street South between Westforest Trail and Eastforest Trail (intersection improvements, pedestrian/cyclist landing areas, converting the existing sidewalk to a wider MUP, adding a new pedestrian refuge island)
- Timing: July - September 2026
- Construction impact: The sidewalk will remain fully closed during construction. Pedestrians are advised to plan ahead and use alternative routes around the work zone to access nearby schools and the Greengable Park baseball diamond.
- Victoria Street between west of Lancaster Street to East of Weber Street (isolated sidewalk panel removal and replacement, curb repairs)
- Note: the work is anticipated to begin on or around June 24 for approximately one week. There will be localized lane closures; however, traffic will be maintained in both directions.
- Contact: Ken Brisbois
Wilmot locations
- Huron Street at Milton Street (Type C PXO with rapid flashers)
- Timing: July 21, 2026 (2 weeks)
- Construction impact: temporary lane and sidewalk closures will be in place. Two-way traffic will be maintained, but road users should expect delays. Pedestrians are asked to follow posted detours around the work area
Woolwich locations
- King Street at Cedar Street (Type C PXO with rapid flashers)
- King Street at High Crest Lane (Type C PXO with rapid flashers)
- Timing: on or about July 13, 2026 (approximately 2 weeks)
- Construction impact: There will be a temporary sidewalk closure and construction equipment in the intersections. Motorists and cyclists are advised that two-way traffic will be maintained; however, there will be temporary lane closures and possible delays in the area. Pedestrians are also advised to plan ahead and follow any posted pedestrian detour signage around the work zones.
- Once these PXO's are installed, motorists and cyclists will be required to yield the entire roadway and wait until pedestrians completely cross before proceeding.
Contact: Kiel Moreau
GRT improvements