Ira Needles Boulevard Resurfacing

Overview

Project number: 07517 |  Updated: June 2026

The Region of Waterloo is resurfacing Ira Needles Boulevard between Yellow Birch Drive and Erb Street West. Deterioration of the pavement on the road has accelerated and has been further worsened by recent winter freeze-thaw conditions.

Maintaining a safe, reliable road network is one of the Region’s core responsibilities. This work will improve the roadway and support the reliable movement of people and goods while helping maintain an accessible and connected transportation network. The work includes:

  • Asphalt resurfacing
  • Installation of new curbs in various areas
  • Manhole and catch basin lid adjustments

This project will be completed in stages:

  • Stage 1: Yellow Birch Road to Highland Road (including Highland roundabout)
  • Stage 2: Highland Road to University Road to Fairway Road North/Kossuth Road
  • Stage 3: University Road to Erb Street West (including University Road roundabout)

Schedule

Design and planning: May - June 2026
Construction: July 2026 - September 2026

Note: timing may be affected by weather conditions and changing project scope; updates will be posted as needed.

Budget

$4,500,000 (TBC)

Contact

Gordon Glavovic, Engineer
Design and Construction, Region of Waterloo
gglavovic@regionofwaterloo.ca

Service First Contact Centre: 519-575-4400

Project details

View the project map

Project studies and resources

  • Council approval report ()

Updates will be shared closer to construction starting

Contact Us

Region of Waterloo HQ
150 Frederick St.
Kitchener, Ontario N2G 4J3
Telephone: 519-575-4400
Fax: 519-575-4481

For general inquiries:
Regionalinquiries@regionofwaterloo.ca

Other Main Region Locations

Cambridge Main Office
150 Main St.
Cambridge, ON N1R 6P9

Waterloo Main Office
99 Regina St. S.
Waterloo, ON N2J 4V3