Hergott Boomer Creek Bridge

Overview

Project number: 06852 |  Updated: October 2026

The Region of Waterloo is rehabilitating the Herrgott Road Boomer Creek Bridge, located south of Ament Line in the Township of Wellesley. The upgrades will help extend the life of the bridge, improve traffic operations, and support existing and future transportation needs in the area. This work includes:

  • Concrete deck repairs
  • Soffit repairs
  • Wingwall repairs with new tie-back system
  • Railing system replacements
  • Drainage improvements
  • Paving of bridge deck and approaches

Schedule

Design and planning: 2024–2025
Detailed design: 2025–2026
Construction: June 2026 - November 2026 (ongoing)

Note: timing may be affected by weather conditions and changing project scope; updates will be posted as needed.

Budget

$1,068,000

Getting around during construction

Two-way traffic will be maintained during construction, with Herrgott Road at Boomer Creek Bridge reduced to a single lane. Road users should expect some delays.

Latest update: Work on the first side of the bridge is complete, including reinforcing and paving the area. Crews will move to the other side of the road to continue construction, and work is expected to be completed by the end of November 2026.

Contact

Jason Guan, Senior Engineer
Design and Construction, Region of Waterloo
jguan@regionofwaterloo.ca

Service First Contact Centre: 519-575-4400

Project details

Contact Us

Region of Waterloo HQ
150 Frederick St.
Kitchener, Ontario N2G 4J3
Telephone: 519-575-4400
Fax: 519-575-4481

For general inquiries:
Regionalinquiries@regionofwaterloo.ca

Other Main Region Locations

Cambridge Main Office
150 Main St.
Cambridge, ON N1R 6P9

Waterloo Main Office
99 Regina St. S.
Waterloo, ON N2J 4V3