Manser Road Watermain

Overview

Project number: 04082 |  Updated: June 2026

The Region of Waterloo will be installing a new watermain along Manser Road, from south of Lin Dunn Lane to North of Lin Dunn Lane to improve the capacity of the local water distribution system

Schedule

Design and planning: 2025–2026
Construction: July 2026 - September 2026

Note: timing may be affected by weather conditions and changing project scope; updates will be posted as needed.

Budget

$444,000

Getting around during construction

Two-way traffic will be maintained on Manser Road for the duration of construction. Access to driveways will be maintained as much as possible during work and at the end of each day.

Contact

Chris Gatchene, C.E.T
Supervisor Infrastructure Renewal, Region of Waterloo
CGatchene@regionofwaterloo.ca

Service First Contact Centre: 519-575-4400

Project details

View the project map

Project studies and resources

Contact Us

Region of Waterloo HQ
150 Frederick St.
Kitchener, Ontario N2G 4J3
Telephone: 519-575-4400
Fax: 519-575-4481

For general inquiries:
Regionalinquiries@regionofwaterloo.ca

Other Main Region Locations

Cambridge Main Office
150 Main St.
Cambridge, ON N1R 6P9

Waterloo Main Office
99 Regina St. S.
Waterloo, ON N2J 4V3