Highway 7/8 Pedestrian Bridge

Overview
Project number: 66114 | Updated: May 2025
Construction of a pedestrian and cycling bridge has been installed over Highway 7/8 connecting Avalon Place to Chandler Drive/Strasburg Road. The new bridge can be accessed through a ramp or staircase on each side and is met with new sidewalk along the south side of Avalon Place and a multi-use path along Strasburg Road to Ottawa Street. Final landscaping work and finishing touches will be completed this summer.
Schedule
Environmental assessment: 2016–2018
Design and planning: 2018–2022
Construction: Spring 2022–Spring 2025
Landscaping and final touches: Summer 2025
Note: timing may be affected by weather conditions and changing project scope; updates will be posted as needed.
Budget
$9.5 million
Contact
Andrew Doman, Senior Engineer
Project Manager, Region of Waterloo
adoman@regionofwaterloo.ca
Service First Contact Centre: 519-575-4400
Contractor
Eiffage GC Canada
Project details
Project studies and resources
| Project planning and studies |
|
| Committee and Council reports |
|
| Construction activities |
|
Additional notes
Construction for the bridge began in 2022 and was delayed due to supply chain shortages across the country.
This project supports the Region of Waterloo's strategic focus areas(External link): Climate aligned growth and Equitable services and opportunities.