Water and wastewater projects
Learn about the projects currently in progress and opportunities to participate in the process. Water and wastewater projects typically begin with Region of Waterloo Water Services completing an environmental assessment. Upon approval of the environment assessment, responsibility for the project moves to Region of Waterloo Design and Construction.
Project phases:
- Environmental assessment
- Design
- Construction
Project documents may not meet accessibility guidelines due to requirements to include technical information such as maps, process charts and tables. Contact Region of Waterloo Water Services to request alternate formats or to contact the project manager.
Water projects
Baden-New Hamburg Water and Wastewater System Servicing Review |
Current project phase: environmental assessment
Project files: |
Cambridge East Water Supply |
Current project phase: environmental assessment complete Project files:
|
Cambridge Inverness Water Tower Interior Maintenance |
Type of work: removal and replacement of the interior tank lining system and other general maintenance items Duration: the contractor will be onsite from March to June 2021 Location: 39 Dalkeith Drive, Cambridge What you should know: due to the nature of the work nearby residence should be aware of noise at the site. Neighbours can expect elevated noise levels from construction traffic, diesel generators, media blasting equipment and other construction equipment. All of the proposed work is expected to fall within the allowances of the City of Cambridge Noise By-law. Detailed information: The Inverness Water Tower, located at 39 Dalkeith Drive, Cambridge Ontario, is scheduled for interior maintenance from March to June 2021. Construction activities are expected to occur only within the allowances of the City of Cambridge Noise By-law. The general contractor is Landmark Structures Co / Landmark Municipal Services ULC., and their scope of work includes:
Work is expected to start late in February 2021 with the contractor mobilizing to site. The contractor will begin by setting up scaffolding on the inside of the tank to facilitate access to interior surfaces for media blasting, welding, and eventual coating system replacement. Nearby homes will experience elevated noise levels from construction traffic, diesel generators, media blasting equipment, metal reverberation and vacuum trucks. The construction is expected to occur Monday to Friday from 7 a.m. to 5 p.m. |
Cambridge Pressure Zone 1 West |
Current project phase: construction Project file: Environmental Study Report |
Concession Street Bridge Watermain Repair |
|
Conestogo Plains Water Supply System |
Current project phase: construction Project file: Environmental Study Report |
Elmira West Water Tower Painting |
Type of work: Water Tower Maintenance and Painting Duration: The contractor will be onsite from May to November 2021 Location: 1307 Floradale Road Elmira Ontario What you should know: due to the nature of the work nearby residence should be aware of noise at the site. Neighbours can expect elevated noise levels from construction traffic, diesel generators, media blasting equipment and other construction equipment. All of the proposed work is expected to fall within the allowances of the Woolwich Township Noise By-law. Detailed information: The Elmira West Water Tower, located at 1307 Floradale Road, Elmira Ontario, is scheduled for maintenance and painting from May to November 2021. Construction activities are expected to occur within the allowances of the Woolwich Township Noise By-law from Monday to Friday from 7 a.m. to 5 p.m. The general contractor is Landmark Structures Co / Landmark Municipal Services ULC., and their scope of work includes:
Work is expected to start late in May 2021 with the contractor mobilizing to site. The contractor will begin by setting up scaffolding to facilitate access to the painted surfaces for media blasting, welding, and eventual coating system replacement. |
Erb Street Water Supply - Iron and Manganese Water Treatment Upgrades |
Current project phase: environmental assessment Project files: Current Engagement:
Past Engagement:
|
Kitchener Zone 4 Trunk Watermain |
Current project phase: construction Project files:
|
New Dundee Water Supply - Iron and Manganese Water Treatment Upgrades |
Current project phase: environmental assessment Project Files: Current Engagement:
|
Regional Water System Upgrades in Cambridge and North Dumfries (formerly the West Cambridge Water System Upgrades) |
Current project phase: environmental assessment Project files: Current engagement:
Past engagements:
|
Shingletown Wells Iron and Manganese Treatment Upgrades |
Current project phase: environmental assessment Project files: Current engagement:
Past engagements:
|
Waterloo North Water Supply System |
Current project phase: design Project file: Environmental Study Report |
William Street - Strange Street Water Supply |
Current project phase: design Project files:
|